Monday, March 14, 2016

Hoorah

Well the work has started on my kitchen refurbishment. The old stuff was ripped out very fast and new electric points installed.

















The wall in the left corner shows a lot of trouble from the water leak from the bathroom stop tap and pipe. Seems the water must have been leaking for quite some time. If it had gone the other way to where there was a bare wall in the bathroom, it would have shown up a lot earlier.
Had a visit from the bosses and they say it will be finished by mid-day Friday.

Seems very odd to me - when they re-did the electric points they had to rip out the old wall points and switches because it was all buried in the wall. What are they doing now with the re-wiring?
Burying it in the wall again from the conduits on down.



No comments: