At the moment my living room is piled up with the contents
of my kitchen. “How did this happen?” You say to yourself.
Well I have been down on the list to get a re-furbished
kitchen from my landlord. Around three weeks ago the crew turned up to take the
measurements and etc. and printed out a very nice plan of what it would be
like.
They told me I would get a letter fixing up a date for around
three weeks time..
On Friday the 18th I had an Email from the Alliance Housing
assistance officer, she said she had heard from the kitchen people that Health
and Safety (The appointed nose pokers of Official Circles) had said I must have
a perfectly clear access through my hallway and to the kitchen. Therefore the
work which they had scheduled to start Monday 22nd Feb. could not
take place.
Now I am almost overflowing with reference books and so
have two small bookcases there. This was the first notification I had of all of
this. What you might ask had happened to the letter telling me when they would
start? It got lost in the files of Health and Safety presumably.
I immediately sent a reply to the Alliance officer saying it would be cleared
and the kitchen emptied by Monday Morning.
Friday I spent clearing the two bookcases and stacking the
contents on other shelves.
Saturday and Sunday I succeeded in moving the kitchen contents to the living
room.
Now my family is not content to be relatively long lived but we also have a
streak of obstinacy in bred into us as well. I was buggered if I would ask for
help.
I managed with the fridge and tumble drier but the little
freezer had me beaten. I asked a neighbour to help me by lifting it onto the
little platform it lived on.
All was ready. Came 8.30 Monday morning
no workforce appeared, I gave them until almost 9.30 and then rang Alliance . What was
happening I queried.
The officer Emailed me back almost immediately, she had told
the surveyor and he was getting in to contact with the workforce.
Later that morning there was a knock at my door two people had arrived a lady
and a gent. She explained that they had had no confirmation from Alliance that the flat
was ready to have the work done.
The gent looked at the emptied kitchen and I explained about the puckers etc on
the wall caused by the leaking pipe that was concealed by the bath in the room
abutting the kitchen. “That will be dealt with” he said. I then asked “When
will the work commence?”
I asked because having never being told by them
previously by letter, Email or spoken word I was curious to know why I had not
been told by them about the Health and Safety worries.
“In around three weeks” was the reply.
So for three weeks and another one to get the job done I am
landed with the situation.